Service Portal
DE | EN
GREMAC
DE EN

Insulation Monitoring - Setup Instructions

Mosa Power Generators 12054HZDT / 13054HBS

This professional guide describes the correct setup of insulation monitoring (Dossena) for maximum operational safety with minimal false alarms.

Optimal Settings

For maximum tolerance with safe operation:

Parameter Setting Value Controller Position Purpose
Pre-Alarm (Pre-AL.) 50 KΩ 50 Early warning without shutdown
Alarm (AL.) 20 KΩ 20 Critical alarm with shutdown
Operating Mode N.E./Aut. N.E./Aut. IT network, automatic operation

Complete Instructions

Open Complete PDF Instructions

Document: GREMAC-IÜ-2026-001-EN | Version: 1.0 | Date: 17.02.2026

Safety Instructions

  • All work must only be performed by qualified electrical personnel
  • Disconnect and secure the system before maintenance work
  • Use appropriate personal protective equipment
  • Contact GREMAC Service if in doubt

Support

For questions about insulation monitoring, contact our service:

GREMAC
GREMAC Service Portal Install as app for quick access